Search This Blog

Sunday, January 13, 2013

Data Process Control 3.2

The new Data Process Control for BPMC has an new updated look and feel. 

In addition, there is improvements to the following key areas:
  • Error logging -  The new Data Process Control now logs error detail to the Windows application log on the application server.  This is especially helpful when troubleshooting issues.
  • Alternating Row Shading on Process Grids - This has been  a long time request. This makes the Load Data panel grid and Schedule panel grid easier to use on instances with large amounts of feeds.

  • Adjustable Left Hand Navigation - The left hand navigation screen now has adjustable navigation.  There are two views: Icon view and Link view.  This helps on instances with large amounts of feeds to maximize Horizontal screen real-estate. Can can be toggled back and forth depending on the need. 

Data Process Control 3.2 is available  in the 312 Pack of BPM Connect.

Data Process  Control 3.2 can be installed on prior pack levels, and requires DBObjects_v1.6.1 or higher for proper operation.

No comments:

Post a Comment