Bug: Daisy Chain via Schedule Panel does not run in correct order, does not match batch seq

This problem occurs if the batch sequence of a feed is changed after a feed is first enabled via the schedule panel. The daisy chain will maintain the original batch seq order, even though the Data Process Control displays it correctly.

To solve this problem, manually delete the entries in the UI_SCHEDULE table, and reapply the schedule via the schedule panel. This will re-sequence the feeds correctly.

Patch Available
There is a patch available to the issue available. Run p_UI_SCHEDULE_AGTBLD_v1.6.sql script to solve problem. This will correctly sequence using the batch override setting. This patch is a part of the 113 pack.